Hydropower Development
Run-of-river schemes taken from site identification and feasibility through detailed engineering and project development.
Hydropower & civil engineering consultancy for Nepal's challenging terrain — from first survey to commissioned powerhouse.
Water is diverted at the intake, cleaned of gravel and sediment, carried along the headrace at a gentle gradient, then dropped through the penstock to spin the turbines in the powerhouse.
Swipe to explore the scheme →
Diverts part of the river flow through a trash rack into the waterway.
Settles out gravel and coarse bed load just after the intake.
Slows the flow so fine sediment settles before it can wear the turbines.
Carries water at a gentle gradient along the hillside, gaining head over the river.
Steadies the flow and absorbs pressure surges ahead of the penstock.
Drops the water steeply under pressure, turning head into energy.
Turbines and generators produce electricity, then water returns to the river.
Hydropower and civil engineering kept in-house, so a scheme's hydraulic design and its structural design are never solved in isolation.
At Turfing Technical Consults, our work begins where the terrain gets difficult — steep valleys, seasonal rivers, and remote sites across Nepal's hills and mountains. Every hydropower and civil engineering project we undertake is built on rigorous field investigation, sound engineering judgment, and hands-on supervision through to commissioning.
As Chairman, my commitment is simple: to deliver technically sound, buildable engineering solutions that stand up to Nepal's demanding terrain and genuinely serve the communities and clients who depend on them. We look forward to partnering with you on your next project.
Turfing keeps hydropower and civil engineering in-house, so a scheme's hydraulic design and its structural design are never solved in isolation.
Run-of-river schemes taken from site identification and feasibility through detailed engineering and project development.
Headworks, intakes, canals, desanders and forebays.
Flow analysis and hydraulic modelling to size each scheme correctly.
Sediment assessment for Himalayan rivers to protect intakes and turbines.
Penstock design and water-hammer checks for safe operation.
Topographic survey, river gauging and GIS mapping from the first site visit.
Structural design of powerhouses, buildings and civil works.
Hands-on site supervision that keeps the design buildable — through to commissioning of the powerhouse.
Every scheme moves through the same five stages, in the same order.
Site walkover, topographic survey, and river gauging to establish ground truth.
Flow analysis and hydraulic modeling to size the scheme correctly.
Layout options assessed for cost, capacity, and constructability.
Full structural and hydraulic design, ready for construction tender.
Site supervision through to commissioning of the powerhouse.
Selected hydropower projects covering feasibility studies, detailed engineering, and project development across Nepal.
Lamjung, Nepal
Khotang, Nepal
Bajura, Nepal
Turfing Technical Consults Pvt. Ltd. — Kathmandu, Nepal